Lesson 4 · Foundations

Amortized Analysis

Amortized analysis finds the cost per operation averaged over a worst-case sequence of operations, so that a rare expensive step is paid for by the many cheap steps around it.

Amortized Analysis concept diagramBars for the actual cost of 16 pushes into a doubling dynamic array: mostly 1, with orange spikes of 2, 3, 5 and 9 at the pushes that resize and copy 1, 2, 4 and 8 values. A dashed line at height 3 marks the amortized cost charged to every push. Three boxes below name the aggregate, accounting and potential methods.actual cost of each push into a doubling array1359amortized cost: 3 per push121324546789810111213141516pushcopiedaggregatetotal ÷ n = 31 ÷ 16 ≈ 1.9accountingcharge 3, bank the unused 2potentialactual + ΔΦ, Φ = 2·size − cap
1

Cost Spread Over a Sequence

  1. Pick the sequence – consider any sequence of n operations on the structure, starting empty.
  2. Find the rare expensive step – identify which operations cost more than O(1) and what triggers them.
  3. Bound the total – show that expensive steps are rare enough, or prepaid enough, that the total is T(n).
  4. Divide – the amortized cost per operation is T(n) / n.

Amortized analysis is a way of measuring the cost of an operation by averaging it over a sequence of operations in the worst case. If any sequence of n operations costs at most T(n) in total, each operation has an amortized cost of T(n) / n, even if a few individual operations are much more expensive.

The word comes from finance: a large payment is amortized when it is spread over many small instalments. In the same way, the occasional expensive step of a data structure, such as resizing an array or rebuilding a tree, is spread over the cheap steps that made it necessary.

Amortized analysis gives a worst-case guarantee on the total. Unlike average-case analysis, it makes no assumption about the input distribution and uses no probability.

  • Actual cost: what one operation really costs when it runs
  • Amortized cost: the cost charged to it in the analysis; the charges must cover the total actual cost
  • Used for dynamic arrays, hash tables, splay trees, union-find and Fibonacci heaps
2

Why Worst-Case per Operation Misleads

A dynamic array (Python list, C++ vector, Java ArrayList) doubles its capacity when full and copies every element into the new block. A push that triggers a resize on an array of n elements costs O(n).

A plain worst-case analysis multiplies that by the number of operations: n pushes, each O(n) in the worst case, gives O(n²). That bound is correct but far too pessimistic, because a resize cannot happen on every push. After doubling to 2k, the next k − 1 pushes are all cheap.

Counting what actually happens, n pushes copy 1 + 2 + 4 + … elements, a sum whose last term is below n, so fewer than 2n copies in total. The whole sequence is O(n) and each push is O(1) amortized. Amortized analysis exists to prove bounds like this.

  • Amortized O(1) still allows a single slow operation; real-time systems may need a true worst-case bound
  • The expensive step must be triggered by earlier cheap steps, or the averaging fails
3

Three Methods Compared

There are three standard techniques. All three prove the same kind of statement, and on the dynamic array they all give 3 per push. They differ in where the bookkeeping lives: in the total, in stored credits, or in a function of the structure's state.

Aggregate, accounting and potential methods
MethodIdeaCharge per operationCondition to prove
Aggregatebound the total cost of n operationssame for all: T(n) / nT(n) holds for every sequence
Accounting (banker's)overcharge cheap operations, store the surplus as creditcan differ by operation typecredit never goes negative
Potential (physicist's)store the surplus as a potential Φ of the whole structureactual + Φ(after) − Φ(before)Φ(start) = 0 and Φ ≥ 0 always
  • Aggregate is simplest when every operation is of one kind
  • Accounting is easiest to explain: the credit sits on specific elements
  • Potential is the most general and is used for splay trees and Fibonacci heaps
Key reference

Terms, operations, and practical uses

Core vocabulary

  • Amortized costCost charged per operation so that charges cover the actual total of any sequence.
  • Actual costWhat one operation really costs when it runs.
  • CreditPrepaid cost stored by the accounting method; never negative.
  • Potential ΦA function of the structure's state that stores prepaid work.

Formulas

  • Aggregateamortized = T(n) / n.
  • AccountingΣ ĉᵢ ≥ Σ cᵢ for every prefix.
  • Potentialĉᵢ = cᵢ + Φ(Dᵢ) − Φ(Dᵢ₋₁), with Φ(D₀) = 0 and Φ ≥ 0.
  • Dynamic arrayΦ = 2·size − capacity gives 3 per push.
Implementation

Code in Python, C++ and Java

class DynamicArray:
    def __init__(self):
        self.capacity = 0
        self.size = 0
        self.items = []
        self.copies = 0

    def push(self, value):
        copied = 0
        if self.size == self.capacity:
            # Full: allocate double the room and copy every element across.
            self.capacity = max(1, 2 * self.capacity)
            bigger = [None] * self.capacity
            for i in range(self.size):
                bigger[i] = self.items[i]
            self.items = bigger
            copied = self.size
            self.copies += copied
        self.items[self.size] = value
        self.size += 1
        return 1 + copied


def increment(bits):
    flips = 0
    i = 0
    while i < len(bits) and bits[i] == 1:
        bits[i] = 0
        flips += 1
        i += 1
    if i < len(bits):
        bits[i] = 1
        flips += 1
    return flips


def copies_growing_by_one(n):
    # Growing by a fixed step copies the whole array on every push.
    return n * (n - 1) // 2


def copies_doubling(n):
    arr = DynamicArray()
    for v in range(1, n + 1):
        arr.push(v)
    return arr.copies


print("Dynamic array with doubling, starting at capacity 0")
print("push  cap  copied  cost  total  3n  bank")
arr = DynamicArray()
total = 0
for v in range(1, 10):
    cost = arr.push(v)
    total += cost
    print(
        f"{v:>4}  {arr.capacity:>3}  {cost - 1:>6}  {cost:>4}  {total:>5}  "
        f"{3 * v:>2}  {3 * v - total:>4}"
    )
print(f"total {total} for 9 pushes: amortized {total / 9:.2f} per push, bound 3")
print()

print("Binary counter, 16 increments")
bits = [0] * 5
total = 0
for k in range(1, 17):
    flips = increment(bits)
    total += flips
    shown = "".join(str(b) for b in reversed(bits))
    print(f"{k:>2}  {shown}  flips {flips}  total {total:>2}")
print(f"total {total} flips for 16 increments: amortized {total / 16:.2f}, bound 2")
print()

print("Copies made: doubling vs growing by one")
for n in [9, 100, 1000]:
    print(f"n = {n:>4}  doubling {copies_doubling(n):>4}  by one {copies_growing_by_one(n):>6}")
#include <algorithm>
#include <cstdio>
#include <vector>

struct DynamicArray {
    int capacity = 0;
    int size = 0;
    int* items = nullptr;
    long long copies = 0;

    ~DynamicArray() { delete[] items; }

    int push(int value) {
        int copied = 0;
        if (size == capacity) {
            // Full: allocate double the room and copy every element across.
            capacity = std::max(1, 2 * capacity);
            int* bigger = new int[capacity];
            for (int i = 0; i < size; i++) bigger[i] = items[i];
            delete[] items;
            items = bigger;
            copied = size;
            copies += copied;
        }
        items[size++] = value;
        return 1 + copied;
    }
};

int increment(std::vector<int>& bits) {
    int flips = 0;
    size_t i = 0;
    while (i < bits.size() && bits[i] == 1) {
        bits[i] = 0;
        flips++;
        i++;
    }
    if (i < bits.size()) {
        bits[i] = 1;
        flips++;
    }
    return flips;
}

long long copiesGrowingByOne(long long n) {
    // Growing by a fixed step copies the whole array on every push.
    return n * (n - 1) / 2;
}

long long copiesDoubling(int n) {
    DynamicArray arr;
    for (int v = 1; v <= n; v++) arr.push(v);
    return arr.copies;
}

int main() {
    std::printf("Dynamic array with doubling, starting at capacity 0\n");
    std::printf("push  cap  copied  cost  total  3n  bank\n");
    DynamicArray arr;
    int total = 0;
    for (int v = 1; v <= 9; v++) {
        int cost = arr.push(v);
        total += cost;
        std::printf("%4d  %3d  %6d  %4d  %5d  %2d  %4d\n", v, arr.capacity, cost - 1, cost, total, 3 * v,
                    3 * v - total);
    }
    std::printf("total %d for 9 pushes: amortized %.2f per push, bound 3\n\n", total, total / 9.0);

    std::printf("Binary counter, 16 increments\n");
    std::vector<int> bits(5, 0);
    total = 0;
    for (int k = 1; k <= 16; k++) {
        int flips = increment(bits);
        total += flips;
        char shown[6] = {};
        for (int i = 0; i < 5; i++) shown[i] = (char)('0' + bits[4 - i]);
        std::printf("%2d  %s  flips %d  total %2d\n", k, shown, flips, total);
    }
    std::printf("total %d flips for 16 increments: amortized %.2f, bound 2\n\n", total, total / 16.0);

    std::printf("Copies made: doubling vs growing by one\n");
    for (int n : {9, 100, 1000}) {
        std::printf("n = %4d  doubling %4lld  by one %6lld\n", n, copiesDoubling(n), copiesGrowingByOne(n));
    }
    return 0;
}
public class Main {
    static class DynamicArray {
        int capacity = 0;
        int size = 0;
        int[] items = new int[0];
        long copies = 0;

        int push(int value) {
            int copied = 0;
            if (size == capacity) {
                // Full: allocate double the room and copy every element across.
                capacity = Math.max(1, 2 * capacity);
                int[] bigger = new int[capacity];
                for (int i = 0; i < size; i++) bigger[i] = items[i];
                items = bigger;
                copied = size;
                copies += copied;
            }
            items[size++] = value;
            return 1 + copied;
        }
    }

    static int increment(int[] bits) {
        int flips = 0;
        int i = 0;
        while (i < bits.length && bits[i] == 1) {
            bits[i] = 0;
            flips++;
            i++;
        }
        if (i < bits.length) {
            bits[i] = 1;
            flips++;
        }
        return flips;
    }

    static long copiesGrowingByOne(long n) {
        // Growing by a fixed step copies the whole array on every push.
        return n * (n - 1) / 2;
    }

    static long copiesDoubling(int n) {
        DynamicArray arr = new DynamicArray();
        for (int v = 1; v <= n; v++) arr.push(v);
        return arr.copies;
    }

    public static void main(String[] args) {
        System.out.println("Dynamic array with doubling, starting at capacity 0");
        System.out.println("push  cap  copied  cost  total  3n  bank");
        DynamicArray arr = new DynamicArray();
        int total = 0;
        for (int v = 1; v <= 9; v++) {
            int cost = arr.push(v);
            total += cost;
            System.out.printf("%4d  %3d  %6d  %4d  %5d  %2d  %4d%n", v, arr.capacity, cost - 1, cost, total, 3 * v,
                    3 * v - total);
        }
        System.out.printf("total %d for 9 pushes: amortized %.2f per push, bound 3%n%n", total, total / 9.0);

        System.out.println("Binary counter, 16 increments");
        int[] bits = new int[5];
        total = 0;
        for (int k = 1; k <= 16; k++) {
            int flips = increment(bits);
            total += flips;
            StringBuilder shown = new StringBuilder();
            for (int i = 4; i >= 0; i--) shown.append(bits[i]);
            System.out.printf("%2d  %s  flips %d  total %2d%n", k, shown, flips, total);
        }
        System.out.printf("total %d flips for 16 increments: amortized %.2f, bound 2%n%n", total, total / 16.0);

        System.out.println("Copies made: doubling vs growing by one");
        for (int n : new int[] {9, 100, 1000}) {
            System.out.printf("n = %4d  doubling %4d  by one %6d%n", n, copiesDoubling(n), copiesGrowingByOne(n));
        }
    }
}
Watch it run

Step through it

Running on push 1, 2, …, 9 into an array that starts at capacity 0

array: size 0, capacity 0no slots allocated yetrunning total of actual cost03n123456789pushbank: 3 paid per push, minus costcharge every push 3 coins:1 pays for the write2 are saved for a copycost of a push = 1 write + (values copied, if it resizes)claim: n pushes cost at most 3n in total
Step 1

An empty dynamic array with capacity 0

Each push writes one value, costing 1. When the array is full it must first allocate a bigger block and copy every value across, costing 1 per value copied. The question is what one push costs, averaged over a whole sequence.

Output
1 / 13
4

Aggregate Method

The aggregate method bounds the total actual cost T(n) of any sequence of n operations, then gives every operation the same amortized cost T(n) / n.

Dynamic array example. Start with capacity 0 and double when full. Push i resizes exactly when i − 1 is 0 or a power of two, copying i − 1 elements. Over n pushes the copies are 1 + 2 + 4 + … + 2^⌊log₂(n−1)⌋ < 2n, and the writes are n. So T(n) < 3n and each push costs O(1) amortized. The listing prints this for n = 9: 15 copies plus 9 writes = 24, under 3n = 27.

  • Geometric sum: 1 + 2 + 4 + … + m < 2m
  • Aggregate cost of n pushes: T(n) < 3n
  • Weakness: it gives one amortized cost to every operation type
5

Accounting Method (Banker's Method)

The accounting method assigns each operation an amortized charge, which may be more or less than its actual cost. When the charge is higher, the difference is stored as credit in the data structure. When an operation costs more than its charge, stored credit pays the difference. The one rule: total credit must never go negative, so the charges always cover the actual cost.

Dynamic array example. Charge every push 3. One unit pays for writing the new element. The other two are stored on it: one pays to copy this element at the next resize, one pays to copy an element in the older half that already spent its credit. When the array doubles from k to 2k, the k/2 elements pushed since the last resize hold k credits, exactly enough to copy all k elements. The tracer shows the bank at each push: it never drops below zero.

  • Amortized charge ĉ, actual cost c: credit changes by ĉ − c
  • Invariant: Σ ĉ ≥ Σ c for every prefix of the sequence
  • Different operations may get different charges, e.g. push 2 and multipop 0 on a stack
6

Potential Method

The potential method stores prepaid work as a potential function Φ that maps each state of the structure to a number. The amortized cost of the i-th operation is its actual cost plus the change in potential: ĉᵢ = cᵢ + Φ(Dᵢ) − Φ(Dᵢ₋₁).

Summing over n operations, the Φ terms telescope: Σ ĉᵢ = Σ cᵢ + Φ(Dₙ) − Φ(D₀). If Φ(D₀) = 0 and Φ(Dᵢ) ≥ 0, the total amortized cost is an upper bound on the total actual cost.

Dynamic array example. Let Φ = 2·size − capacity. A push without a resize costs 1 and raises Φ by 2: amortized 3. A push that resizes at size k costs k + 1; Φ falls from 2k − k = k to 2(k + 1) − 2k = 2, a change of 2 − k: amortized (k + 1) + (2 − k) = 3. Every push is O(1) amortized.

  • Choose Φ to be large just before an expensive step and small just after it
  • Φ must start at 0 and never go negative
  • Splay trees use Φ = Σ log(subtree size); Fibonacci heaps use Φ = roots + 2·marked
7

Second Example: a Binary Counter

A k-bit binary counter is incremented by flipping the trailing 1s to 0 and the next 0 to 1. The worst single increment flips all k bits, so a naive bound for n increments is O(nk).

Aggregate: bit 0 flips on every increment, bit 1 on every second, bit j on every 2^j-th. The total over n increments is n + n/2 + n/4 + … < 2n, so each increment is O(1) amortized. The listing counts 31 flips for 16 increments.

Accounting: charge 2 per increment. One unit sets a bit to 1; the other stays on that 1 and pays for resetting it to 0 later. Every 1 bit always holds a credit, so the credit never goes negative. Potential: Φ = number of 1 bits gives the same result: an increment that resets t bits costs t + 1 and changes Φ by 1 − t, amortized 2.

incrementbit 3bit 2bit 1bit 0flips0 → 1000111 → 2001022 → 3001113 → 4010034 → 5010115 → 6011026 → 7011117 → 810004flips per bit over 8 incrementsbit 08bit 14bit 22bit 31total 15 < 2 × 8 = 168 + 4 + 2 + 1 = n (1 + 1/2 + 1/4 + …) < 2n
  • Worst single increment: O(k); amortized: O(1)
  • Adding a decrement breaks the bound: alternating at 0111…1 and 1000…0 costs k every time
8

Amortized vs Average Case

Amortized and average-case analysis both produce a number that can be smaller than the worst case, but they mean different things. Average case is an expectation over a probability distribution of inputs, and an unlucky input can be slow. Amortized is a bound on the total of every sequence, with no probability, so no input can defeat it.

Worst-case, average-case, expected and amortized bounds
AnalysisAverages overGuaranteeExample
Worst casenothing: one operationevery single operationbinary search: O(log n)
Average casea distribution of inputsonly in expectation over inputsquicksort with a fixed pivot: O(n log n)
Expected (randomized)the algorithm's own random choicesin expectation, for every inputrandomized quicksort, hashing
Amortizeda sequence of operationstotal for every sequence, deterministicdynamic array push: O(1)
  • Amortized O(1) does not mean every operation is O(1)
  • Average O(1) does not mean every sequence is O(n)
  • Hash tables are both: expected O(1) lookups, amortized O(1) resizing
9

Where Amortized Bounds Appear

Amortized analysis is how the running times of many standard data structures are proved. In each case, a rare expensive step keeps the structure in a shape that makes later operations cheap.

  • Dynamic array: resizing and copying is rare, so push is O(1)
  • Hash table: rehashing into a table twice the size keeps insert O(1) expected amortized
  • Splay tree: splaying a deep node to the root makes access O(log n)
  • Union-find: path compression on a long path gives O(α(n)) per operation
  • Fibonacci heap: consolidating the root list only in extract-min gives O(1) decrease-key and O(log n) extract-min
  • Monotonic stack and a queue built from two stacks: each element is pushed and popped once, O(1) per element
  • Pattern: every element pays a constant amount on the way in to cover its later work
  • Practise it: Min Stack and Implement Queue using Stacks